top of page
DEERFIELD ROAD RECONSTRUCTION
Construction and Resident Engineering

Client

Village of Deerfield

Location

Deerfield, Illinois
Highland Park, Illinois

Scope of Work

Roadway Reconstruction

Project Team

Gregory Benske

Project Manager

Edward Herlihy, PE

Resident Engineer

Glen Kirchen, PE

Resident Engineer

Jacob Warren, PE

Assistant Resident Engineer

Victoria Han, EI

Documentation Engineer

Hyder Syed

Construction Engineer

This $18.2M IDOT Local Agency project required construction inspection services for 2.39 miles of full and partial pavement reconstruction in the Village of Deerfield and the City of Highland Park.  Work included HMA surface removal and resurfacing, pavement patching, pavement removal and replacement with full depth HMA and jointed PCC pavement, combination concrete curb and gutter, storm sewer, cured-in-place pipe lining of sanitary sewer and water main replacement in the Village of Deerfield, new sidewalk, bridge resurfacing over the Middle Fork and West Fork of the North Branch of the Chicago River, and modernization and interconnection of ten traffic signals.  The project also included the replacement of the superstructure for the Deerfield Road bridge over Berkeley Road and repairs to the Deerfield Road bridges over Union Pacific Railroad/Old Skokie Highway and US 41.

bottom of page